Fall Brook Bridge Replacement Project
December 30, 2024
The Maine Department of Transportation is replacing, the almost 100-year-old, Main Street Bridge which carries Main Street (Route 201) over Fall Brook. Construction will begin in the summer of 2023 with completion expected by spring 2025.
More information about this project, directly from the Maine DOT, can be found HERE.
Direct link: https://storymaps.arcgis.com/stories/34ca1fa3c4634812ac541a6a9451acbf
********************************
2023 Main Street Bridge (downstream side)
1930’s Main Street Bridge (during construction of current structure)
Circa 1900 Main Street Bridge (steel construction)